Search a dated, incomplete station subset. Connector counts and straight-line distance are references only—not live availability, driving distance, power, hours or network coverage.
The bundled snapshot contains 338 station rows and 636 connector records, source-dated December 2025. It has no current record-level verification, live status, operator, opening hours or connector power.
DEWA announced more than 1,860 charging points on 19 January 2026. Stations and charging points are not the same unit, but this newer official figure confirms the local snapshot is not comprehensive.
Official pages checked 30 July 2026 conflict. DEWA’s tariff page (last updated 16 May 2026) lists AC AED 0.64/kWh and DC AED 1.14/kWh with 5% VAT. Its EV service guide says rates effective 30 September 2024 are AC AED 0.70/kWh and DC AED 1.20/kWh plus VAT. Until DEWA reconciles those pages, UAECalc withholds a cost result.
338 visible records. Status, operator, hours and power remain unknown.
Loading clustered reference map…
Snapshot attribution: Dubai Pulse dataset published by Dubai Electricity and Water Authority (DEWA). Source date: December 2025. Limitations reviewed: 30 July 2026. Map tiles: OpenFreeMap/OpenMapTiles/OpenStreetMap.
The source snapshot does not contain a trustworthy current operator, opening-hours, power or live-status field. “Unknown” is intentional: a station name or connector type must not be turned into a claim about current access or capability.
Type 2, CCS and CHAdeMO labels identify connector families in the snapshot. They do not prove a unit’s kW rating, vehicle compatibility or session duration. Vehicle limits, battery temperature and state of charge, station configuration and shared capacity can all affect a session.
If you share a location, the list uses the Haversine equation with a 6,371 km Earth radius. The result is straight-line distance only. It does not model roads, traffic, barriers, parking access or travel time.
Before travelling, use DEWA’s current locator or smart app to check the specific site. DEWA’s service guide also shows that access hours can differ by location category.
⚠️ Disclaimer: This is a stale, incomplete reference snapshot—not DEWA's live system. It does not verify coverage, availability, access, operator, hours, connector power, compatibility, charging time, route distance or price. Confirm every trip and payable rate with DEWA or the relevant operator.
No. This is a 338-row reference snapshot source-dated 2025-12. DEWA announced more than 1,860 charging points on 19 January 2026, including stations licensed with public and private entities. A station row and a charging point are different units, but the announcement confirms this snapshot is not complete coverage.
No. Every record is explicitly marked status unknown. Use DEWA’s official locator or smart app and verify access before travelling.
It is a straight-line Haversine distance from the location you choose to share. It is not driving distance, route time, traffic, access or charger availability.
This page does not estimate cost. Official DEWA pages checked on 30 July 2026 conflict: the tariff table lists AC AED 0.64/kWh and DC AED 1.14/kWh with 5% VAT, while the EV service guide says AC AED 0.70/kWh and DC AED 1.20/kWh plus VAT. Confirm the payable rate directly with DEWA.
No. This snapshot records connector type and count only. It does not establish unit power, vehicle compatibility, battery conditions, sharing or session duration.
No hours claim is made for any record. DEWA’s service guide gives different access hours for some location categories, so verify the specific site before travelling.